Cementing unit ANP-320 on a sledge

From 2 900,000 ₽

In stock

Purpose

Pumping unit UNBP-125x32 (ANP-320) without water supply unit (pressing unit) is designed for injection of various non-aggressive media into wells in the process of their routine and workover maintenance.

Composition

  • sledge;
  • high-pressure pump;
  • manifold;
  • YAMZ-238 or YAMZ-236 NE2 engine;
  • transmission;
  • control system for gears, clutch, fuel pump and engine stopping, pump activation;
  • electrical equipment.

Execution

  • in a container*
  • with tent shelter*
  • with self-contained air heater*

Pumping units UNBP-125x32 (ANP-320)

The units are equipped with a heating device for the hydraulic part of high-pressure pumps to ensure operation of the units at low temperatures. Equipped with a system for monitoring the oil temperature in the crankcase of the cementing pump NC-320. Equipped with a collector for simultaneous operation of several aggregates during well cementing and a Ø50 mm adapter for connection to the suction hose receiving line.

A separate delivery of a set of mounted (deck) equipment of pumping unit UNBP-125х32 or equipment installation on the customer's transport base is provided.

Technical specifications

Assembly base Sledge
Power drive YAMZ-236 NE2; YAMZ-238
Drawdown power, not more, kW 176
High-pressure pump NC-320
Useful power, kW 100
Maximum discharge pressure, MPa 40
Highest ideal flow rate, l/sec (l/min) 26 (1560)
Capacity of measuring tank, m3 6
Manifold conditional diameter, mm:
   — receiver line 100
en_GB