Cementing unit ANC-320 on a sledge
From 3 100 000 ₽
In stock
Purpose
Pumping unit UNB-125x32S ( sledge variant) is designed for pumping working fluids when cementing wells in the process of drilling and workover, during other flushing and pumping operations at oil and gas wells.
ANC-320 uses a power unit with a YaMZ-238 or YaMZ-236 NE2 engine as a high-pressure pump drive. The unit module can be transported on the helicopter's external suspension.
Installation composition
- metal sledge;
- propulsion system with engine;
- high-pressure pump;
- manifold;
- water feeder unit.
Execution
- in a container*
- with tent shelter*
- with self-contained air heater*
Cementing unit ANC-320C; UNB-125x32C (sledge variant)
Equipped with a heating device for the hydraulic part of high-pressure pumps to ensure operation of the units at low temperatures.
The unit is equipped with a collector for simultaneous operation of several units during well cementing and a Ø50 mm adapter for connection to the suction hose receiving line.
Technical specifications
Assembly base | metal sledge |
Power drive | YaMZ-238 or YaMZ-236NE2 |
Drawdown power, not more, kW | 190 |
High-pressure pump | NC-320 |
Useful power, kW | 100 |
Maximum discharge pressure, MPa | 40 |
Highest ideal flow rate, l/sec (l/min) | 26 (1560) |
Capacity of measuring tank, m3 | 6 |
Manifold conditional diameter, mm: | |
— receiver line | 100 |
— discharge line | 50 |
Cement mortar tank capacity, m3 | 0,25 |
Water feeder unit | ZMZ-511 (GAZ-53); D-144 engine |
Motor shaft speed, rpm: | |
— maximal | 3200 |
— working | 2500—2950 |
Power output, kW | up to 92 |
Centrifugal pump | CNS 38-154 |
Flow rate, l/sec (l/min) | 10,5 (630) |
Pressure, MPa | 1,54 |